UTILITY MODERNIZATION OF EP-300 ETHYLENE PLANT

Utility Modernization of EP-300 Ethylene Plant

The project consists of the construction of two boilers and steam turbine generator sets with a capacity of 2×240 ton/hour high pressure steam and 2×16.5 MW electric power. A common Water Treatment Facility has also been constructed to provide the necessary treated water to the plant.

The produced steam and power consumed by the existing Ethylene Plant at Sumgait.

GAMA Industry performed the turnkey construction works of the plant as the subcontractor to Main Contractor Chiyoda of Japan.