Yamal LNG Project

Yamal LNG Project, CWP3B Package: Module Installation and Connection Works for Utility and Offsite, Mechanical Works, Piping Works, EPC (Engineering-Procurement-Erection) Tanks and Buildings, Electrical and Instrumentation Works.

Installation of the Yamal LNG Plant which is the first LNG plant on the pole, in addition is one of the world’s largest industrial facilities are completed successfully despite the harsh and challenging weather conditions.

Kaluga Electro Steel Melting Complex

Kaluga Electro Steel Melting Complex Project is realized as a “Greenfield Project” by GAMA Industry Inc.

The complex, which has been working in normal manufacturing regime since August 2013, can handle 2 million ton of scrap iron and produce 1 million ton of reinforcing steel bars and hot rolled profiles annually.

The Project, which has quite big volume of works with main items of 2,000,000 m3 earthworks, 120,000 m3 concrete, 45,000 ton structural steel and 10,000 ton equipment erection,  consists of electric arc and ladle furnaces, 8-strand caster, billet handling and storage facilities, de-dusting plant, water treatment plants, scrap yard, material preparation plant and other auxiliary units.

Vyksa Casting Rolling

GAMA Industry performed civil construction, structural steel erection, equipment installation, pipe prefabrication and piping, painting and insulation works for the process buildings, infrastructure, transformer station, finishing works, electrical and instrumantation installation works, landscaping and roads construction, cold tests and commissioning works of the 1,200,000 ton/year capacity Vyksa Casting Rolling Plant.

Vyksa 250th Year Projects

Hotel Complex construction, Cafe-canteen contruction and Cultural Center renovation:

  • Hotel Complex: At European standarts with 5 star-level, total of 87 unit standart guest room, 5 unit delux and 1 unit king suit. The project consists of all design works (decoration included), construction, procurement and commissining items.
  • Cafe-Canteen Building: Approximately 700 m2 serving to 180 people. Whole superstructure is made of woolen logs procured from Finland.
  • Cultural Center Building: Renewal of roof and its drainage system, exterior door and window works and renewal of exterior building painting with some artistic works repair.

Sakhalin-II LNG Plant

Sakhalin-II LNG Plant offsite, utility, OET piping and steel erection works are implemented.

 

Tomskneft Luginetsky Gas Compressor Station

Luginetsky Gas Compressor Sation is located in a remote area, about 500 km north of Tomsk city in Western Siberia. Ambient temprature varies from +36 C during summer to -55 C in winter time. The station is planned to seperate, compress and dehydrate the associated gas from the Luginetsky oil field.

The maximum anticipated output gas capacity is about 4.3 Mm3 /day. There are two 14 MW gas turbine driven centrifugal compressors in the main station. A booster compressor station, which is, located 1.6 km away feeds the gas to the main station by two screw compressors driven by electric motors.

Gazprom Apartment Complex

Turnkey construction of a 10 – 22 storeys residential apartment complex composed of six buildings with 301 flats, offices, shops, workshops, closed garage for 310 cars and an underground passage.

Nadejda Hotel Complex (5 Star)

Turnkey design, supply and construction of a fully furnished five-star hotel complex comprising: 280 guest rooms, lobby, reception, 2 restaurants, lobby bar, café-patisserie, night club and casino, conference rooms, indoor swimming pool and fitness center, 2 outdoor swimming pools, 12 villas for private guests, beach facilities, outdoor sport fields, outdoor cinema and discotheque, technical center, auxiliary buildings, roads, walkways and gates.

Technical Office Building

Construction of Technical Office Building with a total built-up construction area of 12,000 mis performed on turnkey basis; design, supply and civil construction of the building.