NATPET POLYPROPHYLENE PLANT

NATPET Polyprophylene Plant

GAMA Industry performed civil construction, structural steel erection, equipment installation, pipe prefabrication and piping, painting and insulation works for the reactor building, process buildings, extrusion building, silo, store house, sea water pool, infrastructure, transformer station and the other auxiliary buildings of the 400,000 Ton/year capacity Polyprophylene Plant.

Berri Gas Plant Qatif Facilities

GAMA Industry performed construction of new production facilities and revamping of existing facilities including civil and mechanical works.

EPCC Cement Plant New Clinker Production Line

Construction of the 3,500 ton per day capacity New Clinker Production Line No.3, including raw material and meal preparation and storage, preheater and clinker production, clinker cooling, clinker storage, raw meal and clinker dedusting, heat recovery and transportation systems is implemented.

This project is executed by GAMA Industry Arabia Ltd.

Petrokemya Polyethylene Plant

GAMA Industry performed Engineering-Procurement-Construction of 4 industrial buildings with a total volume of 29,149 cubic meters and execution of complete civil and mechanical installation works for construction of new Polyethylene Plant having a production capacity of 800 KTA.

5×367 MW Shoaiba Thermal Power Plant – Stage 1

Mechanical, electrical & instrumentation erection of works of boiler package (5 Units), mechanical erection works of turbine hall (5 units), mechanical erection works of BoP (Balance of Plant).

Hawiyah Gas Plant

The gas to be treated at Hawiyah Gas Plant arrives to the Plant through gas manifolds and trunk lines. The treated gas is then given to gas pipeline grid system.

GAMA Industry executed two contracts is the mechanical erection works package of Utility and Sulphur Recorvery units of Hawiyah Gas Plant.

The scope covers the construction of 23 buildings, plant foundations, underground RTR piping works and other related works for the first contract. Within the context of the second contract a utilities area (covering steam, instrument air, nitrogen, fire water, utility water, demin-water, etc.), a sulphur recorvery area where the hydrogen sulfide (H2S) in the gas in converted into hydrogen (H2) and molten sulphur (S4), a sulphur loading area (tanks ans loading facilities) and other areas (fire training etc.), are included.

Ibn Zahr Polypropylene II Plant

The existing Polypropylene Plant (PP I) at IBN ZAHR complex in Al-Jubail, Saudi Arabia is extended by a new plant and associated facilities (PP II) to increase the polypropylene capacity to 320 KTA.

GAMA Industry executed the turn-key erection of the PP II plant as a subcontractor to Saudi Arabian Parsons Ltd.

Epoxy Resin Plant

GAMA Industry performed turnkey construction of 19,700 tons per year capacity Epoxy Resin Plant including the port facilities and product pipeline.

Hadeed II Direct Reduction Plant

GAMA Industry performed mechanical erection, partial material supply and instrumentation of 1,240,000 tpy capacity Direct Reduction Plant based on 93% metallisation of DRI.