TURKMENBASHI REFINERY DIESEL HDYROTREATER UNIT & STORAGE TANKS

Turkmenbashi Refinery – Lube Oil Plant

Within the modernisation of the existing Türkmenbashy Refinery, a new 76,200 ton/year capacity lube oil unit is included. GAMA Industry and Philipp Holzmann of Germany formed a consortium to execute the turnkey construction of the plant as a subcontractor to main contractor Technip – Germany.

Turkmenbashi Refinery MSCC Plant

750,000 ton/year Continuous Catalytic Platformer Unit is the first of a series of projects, within the Modernisation Program of the existing 50 years old Turkmenbashi Refinery, located in western Turkmenistan, on the Caspian Sea shores.

GAMA Industry executed the turnkey construction of this refinery unit as a consortium member, together with Chioda Co. from Japan.

Serdar Hotel (5 Star)

GAMA Industry performed design, supply and construction of a five star hotel block with 106 rooms (92 rooms for double, one presidential suit, 8 suites and 6 deluxe suites), lobby, restaurant, ballroom conference hall, indoor and outdoor swimming pools, tennis court and other sport and leisure premises including technical facilities and landscaping.

Construction Area: 10,000 m2 closed area + 16,000 m2 open area

Turkmenbashi Refinery CCR Platformer Unit

750,000 ton/year Continuous Catalytic Platformer Unit is the first of a series of projects, within the Modernisation Program of the existing 50 years old Turkmenbashi Refinery, located in western Turkmenistan, on the Caspian Sea shores.
GAMA Industry executed the turnkey construction works of this unit as a consortium member together with Chiyoda Co. from Japan.

Ertugrul Gazi Mosque and Cultural Center

Detail design, and turn-key supply and construction of a complex of facilities consisting of the mosque, the Turkish Cultural Center and landscaping of 17 ha.

  • Total construction area of the mosque: 3,767 m2
  • Total construction area of the cultural center: 3,500 m2