LINEAR PART OF MAIN GAS PIPELINE “ANANIEV – IZMAIL”

Linear Part of Main Gas Pipeline “Ananiev – Izmail”

GAYES performed turnkey construction of 76 km long pipeline with 1,200 mm diameter, including 6 km long Danube river passage parallel to the existing line and connect to it.

Moreover, construction of transformer buildings, pig receiver and launcher units as well as electrical works and communication and automation systems works are executed.

3×16 MW Tarutino Compressor Station

Turnkey construction of 48 MW compressor station, which increase the pressure of gas from 50 bar to 75 bar by means of which 3.9 billion m3 per year additional capacity is executed.

In addition to main compressor buildings, construction of administrative and control building, gas filling station, fuel stores, gas/diesel electric stations, accumulator building, boiler house and pump station, storages, social facilities, water cleaning unit and 2 water wells as well as electrical and automation works were included in the project.

This project has been executed by GAYES – GAMA Renewable Energy Systems Construction Corp. (formerly Transbalkan A.S.), a subsidiary of GAMA Industry Inc.