16.5 MW CAKIRLAR RUN OF RIVER HYDROELECTRIC POWER PLANT

16.5 MW Cakirlar Run of River Hydroelectric Power Plant

GAMA Renewable Energy Systems Construction Co. (GAYES), a subsidiary of GAMA, executed the project as the enginering, procurement and construction contractor.

With the altitude of 1,400 m – 930 m, run of the river type hydroelectric power plant project has 2×8.25 MW pelton turbines. Electromechanical equipments are provided by VAtech – STE – Indar Consortium on a turn-key basis.

Power Plant is delivered to the Owner with fully operational condition. In addition, GAMA Renewable Energy Systems assisted & managed relations with public & state authorities for the permits and licences on behalf of the Owner/Investor during the construction period.

36.4 MW Lamas Run of River Hydroelectric Power Plant

EPC Contract for 36.4 MW Lamas Run of River Hydroelectric Power Plant is undertaken on a turnkey basis.

With the altitude of 654 m – 80 m, run of the river type hydroelectric power plant project has 2×7.39 MW and 2×10,81 MW pelton turbines.

Vyksa Casting Rolling

GAMA Industry performed civil construction, structural steel erection, equipment installation, pipe prefabrication and piping, painting and insulation works for the process buildings, infrastructure, transformer station, finishing works, electrical and instrumantation installation works, landscaping and roads construction, cold tests and commissioning works of the 1,200,000 ton/year capacity Vyksa Casting Rolling Plant.

3×600 MW Shoaiba IWPP Phase-3

Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.

Tasnee Polyethylene Plant

Construction, structural steel, equipment and piping installation works for the LDPE/HDPE Plant in Jubail city of Saudi Arabia is subcontracted to GAMA Industry Arabia Ltd. by the main contractor Tecnimont Arabia Ltd.

Rabigh Cement Plant Expansion

GAMA performed construction of a new clinker production line with a capacity of 7,000 tons/day starting from and including the new limestone crusher up to and including the packing and bulk loading plant as well as construction work for new power plant and connection to existing lines.

Petro Rabigh Polyethylene Plant, PC1 – PE Plants

GAMA performed civil construction, structural steel erection, equipment installation, pipe prefabrication and erection, painting and insulation works for the two reactor buildings, process buildings, extrusion building, powder & pellet silo structures & silos, infrastructure, transformer stations and the other auxiliary buildings of the two polyethylene plants which are EPPE (Easy Process Polyethylene) and LLDPE (Linear Low Density Polyethylene) having production capacity of 250,000 Ton and 350,000 Ton per year respectively.

This project is undertaken by GAMA Industry Arabia Ltd.

Vyksa 250th Year Projects

Hotel Complex construction, Cafe-canteen contruction and Cultural Center renovation:

  • Hotel Complex: At European standarts with 5 star-level, total of 87 unit standart guest room, 5 unit delux and 1 unit king suit. The project consists of all design works (decoration included), construction, procurement and commissining items.
  • Cafe-Canteen Building: Approximately 700 m2 serving to 180 people. Whole superstructure is made of woolen logs procured from Finland.
  • Cultural Center Building: Renewal of roof and its drainage system, exterior door and window works and renewal of exterior building painting with some artistic works repair.

Kashagan Main Works – Tranche 1 & 2

The project is construction of main pipe rack, oil process units and gas compression unit for tranche 1 and 2 of petroleum process facility under Kashagan Field Development Project – Experimental Program.

Scope of project is supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş. a subsidiary of GAMA with %50 share.