HILLA SEWAGE PROJECT (PHASE 1)

HILLA SEWAGE PROJECT (PHASE 1)

The project involves the construction of rainwater and wastewater networks, incorporating 10 main stations and 5 secondary lifting stations.
The Joint Venture is responsible for constructing 359 km of GRP and PVC pipe sewage and rainwater networks, along with civil, structural, and electromechanical works, including the erection of Pumping Stations and commissioning equipment and facilities, under a unit price basis contract.

THE GIL ATHLONE GENERATION FACILITY

GAMA Construction Ireland Limited (GCIL) was awarded as being the EPC Contractor for construction of the GIL Athlone Generation Facility on EPC basis whose scope of works covers the design & equipment / material supply within the BOP boundaries including Grid Connection work and services of overall project scope in compliant with local regulations, international Codes & Standards, and EirGrid Specifications.

THE GIL PROFILE PARK GENERATION FACILITY

GAMA Construction Ireland Limited (GCIL) was awarded as being the EPC Contractor for construction of the GIL Profile Park Generation Facility on EPC basis whose scope of works covers the design & equipment / material supply within the BOP boundaries including Grid Connection work and services of overall project scope in compliant with local regulations, international Codes & Standards, and EirGrid Specifications.

Maleic Anhydrite Plant

The detail project engineering and procurement engineering management contracting of the Maleic Anhydrite plant, which is planned to have an annual production capacity of 50,000 tons, was undertaken by GAMA Industry. The project will be built in Gebkim – Kocaeli Gebze V (Chemical) Specialized Organized Industrial Zone. The project is planned to be completed in 17 months.