5×367 MW Shoaiba Thermal Power Plant – Stage 1
Mechanical, electrical & instrumentation erection of works of boiler package (5 Units), mechanical erection works of turbine hall (5 units), mechanical erection works of BoP (Balance of Plant).
Mechanical, electrical & instrumentation erection of works of boiler package (5 Units), mechanical erection works of turbine hall (5 units), mechanical erection works of BoP (Balance of Plant).