2×660 MW ISKENDERUN SUGOZU COAL FIRED POWER PLANT

2×660 MW Iskenderun Sugozu Coal Fired Power Plant

The project consists of turn-key construction of two units of imported coal fired steam boilers and turbine generator sets with a total capacity of 1320 MW electric power (2×660 MW) including coal handling system, flue gas desulphurization plant, sea water cooling handling system, coal unloading jetty, stack and other auxiliary units.

GAMA – Tekfen Joint Venture was responsible for the construction of the plant, including the coal unloading jetty.

Location Icon
Location
Adana, Turkey
Client Icon
Client
Iskenderun Enerji Uretim ve Ticaret A.S. / Turkey
Contractor Icon
Contractor
Siemens AG, PG Group, Babcock Borsing Power Energy, GAMA - Tekfen JV (%50-%50) and Siemens A.S. (Turkey) Consortium
Duration Icon
Project Duration
41 Months (June 2000 - 22 November 2003)