3×16 MW Tarutino Compressor Station
Turnkey construction of 48 MW compressor station, which increase the pressure of gas from 50 bar to 75 bar by means of which 3.9 billion m3 per year additional capacity is executed.
In addition to main compressor buildings, construction of administrative and control building, gas filling station, fuel stores, gas/diesel electric stations, accumulator building, boiler house and pump station, storages, social facilities, water cleaning unit and 2 water wells as well as electrical and automation works were included in the project.
This project has been executed by GAYES – GAMA Renewable Energy Systems Construction Corp. (formerly Transbalkan A.S.), a subsidiary of GAMA Industry Inc.