6×380 MW Shoaiba Thermal Power Plant (Stage II – Phase 1+2)
GAMA performed Mechanical Erection Works for the 6 fuel oil fired Boilers, Electrostatic Precipitators and Ash Disposal System of the (3+3) x 380 MW Shoaiba Power Plant Units 6 to 11.
Total Erection Weight is 49,572 tons for 6 Units.