AYITLI ASH DAM AND HYDRAULIC ASH TRANSPORTATION SYSTEM (SOMA-B POWER PLANT)

Ayitli Ash Dam and Hydraulic Ash Transportation System (Soma-B Power Plant)

The Ayitli ash dam and hydraulic ash transport system is an integral part of the Soma-B Power Plant. The dam and the transport system were constructed by GAMA Industry under an annex to the second contract (Unit No. 3 and 4) of the Soma Power Plant contracts.

The project consists of ash fill dam (7,5 km from the plant), height: 85 m, crest length: 595 m, derivation tunnel (725 m long, 3 m dia.), redredging station, hydraulic ash transport system, 12 hydraulic ash transport pipelines (14 inches dia.).

Location Icon
Location
Soma, Turkey
Client Icon
Client
Turkish Electricity Authority
Contractor Icon
Contractor
GAMA Industry Inc.
Duration Icon
Project Duration
60 Months (November 1985 - November 1990)
Price Icon
Project Amount
103 Million USD