HAWIYAH GAS PLANT

Hawiyah Gas Plant

The gas to be treated at Hawiyah Gas Plant arrives to the Plant through gas manifolds and trunk lines. The treated gas is then given to gas pipeline grid system.

GAMA Industry executed two contracts is the mechanical erection works package of Utility and Sulphur Recorvery units of Hawiyah Gas Plant.

The scope covers the construction of 23 buildings, plant foundations, underground RTR piping works and other related works for the first contract. Within the context of the second contract a utilities area (covering steam, instrument air, nitrogen, fire water, utility water, demin-water, etc.), a sulphur recorvery area where the hydrogen sulfide (H2S) in the gas in converted into hydrogen (H2) and molten sulphur (S4), a sulphur loading area (tanks ans loading facilities) and other areas (fire training etc.), are included.

Location Icon
Location
Hofuf, Saudi Arabia
Client Icon
Client
Saudi Arabian Oil Company (Saudi Aramco)
Contractor Icon
Contractor
Technip Italy S.p.A.
Duration Icon
Project Duration
29 Months (September 1999 - February 2002)