ANKARA CEMENT PLANT

Ankara Cement Plant

GAMA Industry performed construction and erection of 1,500 ton/day capacity clinker production line as an extension to the existing factory, including crushing plant, raw materials grinding plant, preheater, kiln, dedusting unit and other associated systems including power supply system.

 

White House (Russian Parliament) Building Repair Works

Supply, repair and renovation of architectural and finishing works of Russian Parliament Building (White House) which had been heavily damaged and burned as a result of artillery shelling and gunfire in October 1993.

GAMA was awarded a “Certificate of Honor” by the Russian Government for completing the renovation of the Russian Parliament Building on time and to the highest standards.

Lazurnaya Resort Hotel (5 Star)

GAMA Industry performed turnkey design, supply of materials and construction of a 24-storey five-star hotel comprising 238 normal rooms, 39 deluxe rooms, 17 suits, 6 villas, restaurants, night clubs, casino, health centre, indoor and outdoor swimming pools, tennis courts, beach facilities and garage.

TES-IS Union Headquarters Building

Construction of TES-IS Union Headquarters Building in Ankara with a total built-up construction area of 11,000 m2  on turnkey basis.

The building has 12 storeys, offices, guesthouse with 55 rooms, conference room for 600 person, exhibition hall, restaurant, garage, kitchen, laundry, air-conditioning centre, power generator room, 4 elevators and a service lift.

 

1156 Army Housing Units & Related Facilities

GAMA Industry executed the construction of 29 housing buildings for army officers, consisting of 1,156 flats, child care centre, high school, clinic, library, shopping centre, social building & cinema, heating centre, water storage and water treatment facility, and other auxiliary units.

Denis Coal Handling and Transport System

Design, supply and construction of a unique coal conveyor system, extending from Denis coal mines to Soma Power Plant was performed by GAMA in two phases. A 8,500 m long, single line, down hill belt conveyor system are constructed during the first phase whereas two 5,500 m long lines were installed during the second phase.

The conveyors have a capacity of 1,000 tons/hr each, a belt width of 1,000 mm and belt speed of 4.5 m/sec.

The Project was executed in technological partnership with KRUPP Industritechnik GmbH (Germany), a subcontractor to GAMA Industry.

6×165 MW Soma-B Thermal Power Plant

The Soma-B Power Plant consisting of six coal-fired production units and auxiliary systems, was constructed on a turn-key basis and in three stages as follows:

Stage 1: Construction of 2×165 MW Units 1 & 2

Stage 2: Construction of 2×165 MW Units 3 & 4, including ash dam and hydraulic transport system

Stage 3: Construction of 2×165 MW Units 5 & 6

2×150 MW Cayirhan TPP Flue Gas Desulphurization Plant

Flue gas desulphurization plant for 2×150 MW Cayirhan Thermal Power Plant Units I & II, consisting of 2 ea. 100 m high scrubbers, auxiliary systems and ancillary buildings.

GAMA Industry is responsible for detail design of all civil works, buildings, locally fabricated structural steel and equipment, complete electrical and instrumentation installation, and start-up and commissioning of the plant.