UNDERSECRETARIAT OF TREASURY & FOREIGN TRADE BUILDING

Undersecretariat of Treasury & Foreign Trade Building

Supply and construction of 30 storey office building including computer center, 600 m2 conference hall, training center with dormitories, restaurant, kitchen and underground car park for 200 cars.

Total closed building area: 65,000 m2

Outdoor area: 40,000 m2

Ayitli Ash Dam and Hydraulic Ash Transportation System (Soma-B Power Plant)

The Ayitli ash dam and hydraulic ash transport system is an integral part of the Soma-B Power Plant. The dam and the transport system were constructed by GAMA Industry under an annex to the second contract (Unit No. 3 and 4) of the Soma Power Plant contracts.

The project consists of ash fill dam (7,5 km from the plant), height: 85 m, crest length: 595 m, derivation tunnel (725 m long, 3 m dia.), redredging station, hydraulic ash transport system, 12 hydraulic ash transport pipelines (14 inches dia.).

BRISA – Bridgestone Tire Factory

Construction of 100,000 m2 of factory building with space frame steel construction roof, surface hardened reinforced concrete floor, roof covering and wall cladding by painted steel and polyurethane sandwich panels are executed.

Ramada Renaissance Resort Hotel (5 Star)

Construction of the five star Renaissance Resort Hotel comprising one hotel block and several satellite villas, compounds and auxiliary units in Antalya Beldibi region.

Baiji Lube Oil Refinery

GAMA Industry performed complete mechanical equipment and piping erection of the 250,000 tons/year capacity Lube-Oil Plant in Baiji, Iraq.

Ain-Ghazal Waste Water Immediate Relief Pipeline

Turnkey construction of a Waste Water Treatment Plant including sewage decomposing unit, 220 hectares of waste stabilisation and emergency ponds, 40 km long 50” diameter pipeline including cathodic protection, 4 km long access roads, waste collection and pretreatment system, odour control system, 110 kg/hr automatic chlorination system and maintenance facilities.

Yamama Cement Plant

GAMA Industry performed complete mechanical and electrical erection of 1,000,000 tons/year capacity plant, consisting of raw material storage, handling and transport plants, raw mill, kiln and preheater plants, dedusting systems including electroprecipitators, clinker transport and storage systems, cement mill plant, packing and loading plant, high and low voltage power systems and all associated auxiliary systems.