EPCC CEMENT PLANT NEW CLINKER PRODUCTION LINE

EPCC Cement Plant New Clinker Production Line

Construction of the 3,500 ton per day capacity New Clinker Production Line No.3, including raw material and meal preparation and storage, preheater and clinker production, clinker cooling, clinker storage, raw meal and clinker dedusting, heat recovery and transportation systems is implemented.

This project is executed by GAMA Industry Arabia Ltd.

Atyrau Refinery Reconstruction

Construction of additional units (gasoline, diesel, sulfur, hydrogen, coker) and renovation works for the Atyrau Refinery is implemented.

Civil construction works, structural steel works, mechanical works, piping works, electric and instrumentation works, insulation, painting and fire proofing works are performed by GATE (a subsidiary of GAMA with %50 share) as subcontractor to JGC.

2×165 MW Zawia Simple Cycle Gas Power Plant

Complete civil works, manufacturing and installation of GT building and pipe racks steel structure, complete mechanical, electrical and instrumentation installation, provision and operation of camp and office facilities for Alstom staff.

4×360 MW Afsin Elbistan B Thermal Power Plant

Construction of 4×360 MW conventional type lignite fired Power Plant on turn-key basis, including all ancillary units and the flue gas desulphurization plant.

GAMA – Tekfen – Tokar JV (GAMA is the leader with its 40% share) is responsible for the construction and erection of boilers and bunkers, coal stock yard and coal handling system, stacks (2 each, 150 m), flue gas desulphurization plant, storm water system, roads, walkways, fencing and auxiliary buildings (workshop, warehouses, mill repairshop, operation building, cafeteria) of the plant.

Revamping of PETKIM Naphtha Steam Cracking Plant

The Plant modification works relevant with revamping project for the expansion of the plant capacity from 400,000 ton/year to 520,000 ton/year ethylene are implemented on turnkey EPC basis.

Western Libya Gas Project – Wafa Coastal Plant

GAMA Industry performed engineering, procurement and construction of 31 buildings with a total area of 28,600 square meters and execution of complete civil and mechanical installation works for the process, utility, underground and off-site areas of the WAFA Gas Plant.

MAN Ankara Bus & Truck Assembly Plant

Civil, structural steel supply and erection, electrical and HVAC works of MAN Bus and Truck Assembly Plant Extension Facilities in Ankara.

Material supply and construction of 11,515 m2 closed building area and 14,915 m2 open area; complete mechanical erection of buildings including sanitary, plumping & HVAC systems and complete electrical installation of lighting and power systems are implemented.

External Cathodic Protection System

GAMA Industry performed design verification, pre-installation tests, supply and installation of the Cathodic Protection (CP) System and raleted civil and electrical works, CP tests, commissioning, operation and maintenance activities for the part of 150 km of Sarir/Sirt-Tazerbo/Benghazi P.C.C.P. (Prestressed Concrete Cylinder Pipe, 4,000 mm) conveyance line of the Great Man-Made River Project with sacrificial zinc anodes.