TURKMENBASHI REFINERY CCR PLATFORMER UNIT

Turkmenbashi Refinery CCR Platformer Unit

750,000 ton/year Continuous Catalytic Platformer Unit is the first of a series of projects, within the Modernisation Program of the existing 50 years old Turkmenbashi Refinery, located in western Turkmenistan, on the Caspian Sea shores.
GAMA Industry executed the turnkey construction works of this unit as a consortium member together with Chiyoda Co. from Japan.

Epoxy Resin Plant

GAMA Industry performed turnkey construction of 19,700 tons per year capacity Epoxy Resin Plant including the port facilities and product pipeline.

Hadeed II Direct Reduction Plant

GAMA Industry performed mechanical erection, partial material supply and instrumentation of 1,240,000 tpy capacity Direct Reduction Plant based on 93% metallisation of DRI.

Izmit Domestic and Industrial Water Supply Project, Yuvacik Dam

The project mainly consists of the construction of an earthfill dam, installation of a total of 133,290 linear meters of steel and ductile iron water transmission pipe-lines and construction of two booster pumping stations in Built-Operate-Transfer basis.

Ertugrul Gazi Mosque and Cultural Center

Detail design, and turn-key supply and construction of a complex of facilities consisting of the mosque, the Turkish Cultural Center and landscaping of 17 ha.

  • Total construction area of the mosque: 3,767 m2
  • Total construction area of the cultural center: 3,500 m2

AKKIM Hydrogen Peroxide Plant

Manufacturing, construction and erection works of a Hydrogen Peroxide (H2O2), and Carbon Monoxide and Hydrogen plant.

Ankara Metro System, Phase 1

Turnkey construction of 14.6 km heavy rail transit system, 7 km being underground with 12 passenger stations including an operation and maintenance center with parking facility.

GAMA – Guris Joint Venture (50%-50%) executed the detailed design, procurement, construction, test and commissioning of complete civil and building works – incluidng tunneling, building services and tunnel ventilation and installation of all electrical and mechanical subsystems.

The system is equipped with 108 vehicles operating in six-car trains of triplets with 90 second headway moving block automatic train control (ATC) system.

Mersin Villas Complex & Related Facilities

GAMA constructed detached housing (villas) complex within a 85,000 m2 area as a property development project. The project included 173 villas of 5 different types, shopping center, administrative and social facilities, swimming pool, sport fields, children play areas, infrastructure, sewage treatment plant , landscaping and beach facilities.