Sakhalin-II LNG Plant offsite, utility, OET piping and steel erection works are implemented.
Sakhalin-II LNG Plant offsite, utility, OET piping and steel erection works are implemented.
GAMA Industry performed turnkey construction of Yamama Cement Production Line No.7 with 10,000 tonnes/day clinker capacity at the existing cement plant facilities, within the scope of “Sales & Purchase Contract” and “Construction & Erection Contract”, including the construction of a new cement mill unit for the existing Line No.6 .
At the time, world’s biggest cement plant; Yamama Cement Plant is executed by GAMA Industry Arabia Ltd.
GAMA performed Mechanical Erection Works for the 6 fuel oil fired Boilers, Electrostatic Precipitators and Ash Disposal System of the (3+3) x 380 MW Shoaiba Power Plant Units 6 to 11.
Total Erection Weight is 49,572 tons for 6 Units.
GAMA Industry performed civil construction, structural steel erection, equipment installation, pipe prefabrication and piping, painting and insulation works for the reactor building, process buildings, extrusion building, silo, store house, sea water pool, infrastructure, transformer station and the other auxiliary buildings of the 400,000 Ton/year capacity Polyprophylene Plant.
This project is undertaken by REGA (GAMA – Renaissance JV).
GAMA performed camp infrastructure works.
Rasgas LNG Plant Train-6,Train-7 process and utility lines site development, soil improvement and preparation works are implemented.
Mechanical, electrical and instrumentation erection works of a new 4,000 ton per day capacity clinker production line.
GAMA performed site preparation; excavation of cooling water pipeline trenches, backfilling works for structures, demolishing works of existing facilities of LNG Plant.
GAMA Industry performed construction of new production facilities and revamping of existing facilities including civil and mechanical works.