4×350 MW AL KHALIJ PLANT – CIVIL CONSTRUCTION WORKS

2×35 MW Kashagan Natural Gas Fired Simple Cycle Power Plant

2×35 MW Natural Gas Fired Simple Cycle Power Plant is implemented on a turnkey basis.

The Power Plant provides electrical power to be used by the onshore processing facility. The equipments are mainly;  2 nos GE 6B Gas Turbines, 3 nos Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

2×338 MW Maritza East-I Thermal Power Plant

As a consortium partner of main contractor Alstom in 2×338 MW power plant, execution of all civil works and mechanical works in BOP.

Tekfen – GAMA (TGO) executed all civil works of the power plant, and BOP mechanical works (all mechanical works excluded from units), piping, HVAC and FF works.

3×600 MW Shoaiba IWPP Phase-3

Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.

238 MW Kashagan Combined Cycle Power Plant

Execution of all civil works, steel structure, mechanical, electrical erection, piping, instrumentation, painting and insulation works of 238 MW natural gas fired combined cycle power plant composed of 4×42 MW gas turbines and 2×35 MW steam turbines for the power supply for Trench 1 and 2 of Kashagan Petroleum Area.

This project is undertaken and executed by GATE İnşaat Taahhüt San. ve Tes. A.Ş., a subsidiary of GAMA with %50 share.

2×165 MW Zawia Simple Cycle Gas Power Plant

Complete civil works, manufacturing and installation of GT building and pipe racks steel structure, complete mechanical, electrical and instrumentation installation, provision and operation of camp and office facilities for Alstom staff.

4×360 MW Afsin Elbistan B Thermal Power Plant

Construction of 4×360 MW conventional type lignite fired Power Plant on turn-key basis, including all ancillary units and the flue gas desulphurization plant.

GAMA – Tekfen – Tokar JV (GAMA is the leader with its 40% share) is responsible for the construction and erection of boilers and bunkers, coal stock yard and coal handling system, stacks (2 each, 150 m), flue gas desulphurization plant, storm water system, roads, walkways, fencing and auxiliary buildings (workshop, warehouses, mill repairshop, operation building, cafeteria) of the plant.

2×660 MW Iskenderun Sugozu Coal Fired Power Plant

The project consists of turn-key construction of two units of imported coal fired steam boilers and turbine generator sets with a total capacity of 1320 MW electric power (2×660 MW) including coal handling system, flue gas desulphurization plant, sea water cooling handling system, coal unloading jetty, stack and other auxiliary units.

GAMA – Tekfen Joint Venture was responsible for the construction of the plant, including the coal unloading jetty.